Skip to main content
Loading…
This section is included in your selections.

A lot that was platted before the Effective Date and that does not meet the requirements of the zone district(s) in which it is located may be used for any permitted use in that zone district(s), provided the structure in which the use is operated complies with the following standards.

A. Subarea A. In Subarea A, the structure shall comply with all applicable standards in Section 146-4.2 (Dimensional Standards) for the zone district(s) where the property is located, except that required building side setbacks shall be reduced and maximum lot coverage shall be increased in the same proportion that the actual lot size bears to the required minimum lot size in that zone district. For example, if the actual lot size is 80 percent of the required minimum lot size, required side setbacks shall be 80 percent of those required by Section 146-4.2 (Dimensional Standards).

B. Subareas B and C. In Subareas B and C, the structure shall comply with all applicable standards in Section 146-4.2 (Dimensional Standards) for the zone district(s) where the property is located. (Ord. No. 2019-49 § 1, 08-19-2019)