Sec. 90-174. Required inspections.
This section is included in your selections.
Section 305(e)1.A of the guidelines adopted in section 90-166 is amended to read as follows:
(a) Foundation inspection: To be made (when applicable).
1. Caisson (pier) inspection: After the caisson has been drilled and before concrete is placed (special inspection required).
2. Footing inspection: After excavation is complete, forms are in place and before concrete is placed.
3. Reinforcing inspection: After steel is in place and before concrete is placed.
4. Foundation and waterproofing: After waterproofing is applied and before backfilling is started.
(Code 1979, § 24-33)