Skip to main content
Loading…
This section is included in your selections.

Drawings and records shall be kept by the owner of an underground facility and shall be provided to the director within 30 days of installation in accordance with the Roadway Design and Construction Specifications Manual, as amended and adopted. (Code 1979, § 39-138; Ord. No. 2019-09, § 11, 3-18-2019; Ord. No. 2015-25, § 6, 6-29-2015)

Editor's note: See the note to § 126-506.