Installation of an underground facility shall be in accordance with the Roadway Design and Construction Specifications Manual, as amended and adopted.

(1) Prior to issuance of a permit, drawings prepared and signed by an authorized representative of the owner in accordance with the Roadway Design and Construction Specifications Manual, as amended and adopted, shall be submitted to the director.

(2) Additional permits may be required when installation is to take place in the right-of-way, as that term is defined in section 126-131 of this Code. (Code 1979, § 39-135; Ord. No. 2019-09, § 8, 3-18-2019; Ord. No. 2015-25, § 6, 6-29-2015)

Editor's note: See the note to § 126-506.